GILPIN COUNTY - Gilpin County’s first public electric vehicle chargers went live at the Gilpin County Library on August 28, finally cutting through months of delays and red tape.
County Manager Ray Rears, along with Commissioners Sandy...
This item is available in full to subscribers.
At this time, we ask you to confirm your subscription at www.themtnear.com, to continue accessing the only weekly paper in the Peak to Peak region to cover ALL the news you need! Simply click Confirm my subscription now!.
If you are a digital subscriber with an active, online-only subscription then you already have an account here. Just reset your password if you've not yet logged in to your account on this new site.
Otherwise, click here to view your options for subscribing.
Questions? Call us at 303-810-5409 or email info@themountainear.com.
Please log in to continue |
GILPIN COUNTY - Gilpin County’s first public electric vehicle chargers went live at the Gilpin County Library on August 28, finally cutting through months of delays and red tape.
County Manager Ray Rears, along with Commissioners Sandy Hollingsworth and Jeff Aiken, joined members of the Library Board of Trustees for the official unveiling.
The County navigated the process for the benefit of its residents and visitors, since no one from the private sector had installed any in the area.
The oversized scissors made their appearance for the occasion to cut the ceremonial ribbon.
Located in the rear parking lot of the library, the setup includes two Level 3 DC fast chargers, capable of up to 125 kW, and a Level 2 charger with two 80-amp ports, totaling four spaces.
Library Board of Trustees President Harv Mastalir said that the power box on site could “light a Super-Walmart,” impressed by how much power the chargers can draw.
Jeffrey Green, owner of Very Nice Brewing, rolled up in his electric truck to give the system a try.
“I charged 30 miles for about $2 on Monday,” he said, pointing out the difference compared to filling a gas tank.
Hollingsworth noted how the chargers will help reduce air and noise pollution.
The total overall cost of the project was $271,625. It was paid for with a mix of rebates and grants equaling $127,500 and a county contribution of $144,125. The County's share of the expenses amounted to 53% of the total cost, according to county officials.
It was supposed to be operational months ago, but final inspections and approvals dragged on longer than expected.
"A lot of the delay, after it was all installed, was getting United Power to sign off on it," said Rears.
While waiting for a charge, drivers are encouraged to step inside the library or walk across the street for a pint at Very Nice Brewing. The Hi Market gas station, better known locally as Taggert’s, is also just down the road for snacks and supplies.
Rears said the chargers are essential in Gilpin’s mountain environment. “Range anxiety is terrible, especially up here because of the grade and the temperatures,” he said. “If any place needs a fast charger, it’s here.”
Congratulations to Gilpin County on their efforts to "go green!"